The control room for the composting facility.
Material that has been sorted into different piles.
Yard Waste.
Food Waste.
The biofilter filled with chesnut bark and cork.
Divya climbing the ladder to see into the biofilter and Eli taking pictures with his camera.
Pile of compost.
Piles of compost outside with tracking numbers.
A couple wind turbines on the way to the incinerator.
Lindsey, Cat, Kestral, and I with our construction hats!
The main building.
One of the furnaces that heats up the sludge from the waste water treatment plant.
A filter for the gas from the fire.
Bags of ash from the fire.
A container of activated carbon that goes into the filter.
Inside the main building.
Inside the main building.
Live videos of the fires in the incinerator from the control room.
Helps generate electricity from the incinerator.
Pile of shredded tire.
A claw that is going to pick up 5 tons of trash.
No comments:
Post a Comment