A closed landfill with soil cover - dry grass.
A closed landfill with clay cover - green grass.
Main pumping building. They need to regulate the amount of oxygen in the pipes with the methane gas because if there is too much there could be an explosion.
Trenches around the landfill to catch the runoff water.
The working face of the open landfill.
The open landfill being built on top of the MSW landfill.
The air quality monitoring station.
Tanks filled with leachte.
A vineyard that I saw on the way to the co-generation plant.
The methane gas is cooled to 5 degrees celcius to remove water and solids.
Vales that direct where the gas goes.
Cylindrical containers are for heat exchange, and the rectangular container converts CO gas to CO2.
The control room.
One of the panels in the control room.
The combustion chamber.
The transformer.
No comments:
Post a Comment